top of page

KEEC
Kikuchi Equipment and Engineering Company
Powering from Here and Beyond
GALLERY

Extra High Voltage AC Testing upto 1000kV

220 KV GIS High Voltage Voltage Withstand Test

1000 kV GIS AC Withstand Voltage Test

220kV Transformer Long Time Induction Withstand Voltage and Partial Discharge
Detection Test

500kV Cable High Voltage AC Test of Cables upto 30km

500kV GIS High Voltage AC Testing

EHV / HV Cable Termination Installation

EHV / HV Cable Termination Installation

EHV / HV Cable Termination Installation

MV Cable Termination Installation

MV Cable Termination Installation

Optical Fiber Cable Installation, Splicing & OTDR Testing

Circuits Al Hatba - Bab Al Azizya and Bab Al Azizya - Al Wataniya, Libya (2023)
220 kV XLPE Underground Cable Circuits Emergency Repair

Circuit North Benghazi Substation - Hadika Substation, Libya (2024)
Emergency Repair

Circuit North Benghazi Substation - Hadika Substation, Libya (2024)
Emergency Repair

Cable Fault Location Works

Cable Fault Location Works

Cable Fault Location Works

Our Storage Area in KIZAD Abu Dhabi for Material Procurement and Supply Chain Management



KEEC Training Centre in KIZAD Abu Dhabi
HV/MV Cable Jointing, Termination, FO Cable Training provided

KEEC Training Centre in KIZAD Abu Dhabi

KEEC Training Centre in KIZAD Abu Dhabi
Successful completion of 400 kV HVDC Cable Jointing Training

BAM Project
For the BAM project, KEEC recommended and executed the raising of the 275 kV outdoor termination steel support structure to compensate for the reduced height caused by replacing the porcelain outdoor termination with a composite outdoor termination.(change a new cable with one GIS termination and one outdoor termination)
bottom of page
